* 帖子主题 * 有高手吗? 你是第 169 位浏览者 kathy 军衔: 三等兵 财产: 经验: 魅力: 来自: 不告诉你 :) 鉴定: 本功能已经被关闭 发帖: 16篇 注册: 2001-11-26 -------------------------------------------------------------------------------- 1. when developing a project scope statement ,which of the following should not be included? a. project justification b. cost/benefit analysis c. project deliverables d. measurable objectives 2. which of the following orgnization structure is used in large orgnizations involved in multiple projects? a. functional b. strong metrix c. projectized d. combination of all of the above 3. To successfully manage a project, the project manager must play both a manager and leadership role. in the manager role the PM will do all but which of the following: a.develop prcedures b. align people c. produce results for stakeholders d focus on the organiazation and its structure e. both b and d 4. which phase of the Acquisition Process Cycle does source qualification reside? a. Pre-award b. Award c. Post award d. Origination answer is a d b b. why......??? what is ' Acquisition Process Cycle' ? -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- [ 本文发表于 2002年9月5日 21:25:54 ] yanxiaojing 军衔: 一等兵 财产: 经验: 魅力: 来自: 不告诉你 :) 鉴定: 本功能已经被关闭 发帖: 78篇 注册: 2001-11-26 -------------------------------------------------------------------------------- 1:a 2: d 3:b -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- [ 本文发表于 2002年9月6日 9:02:32 ] bomber 军衔: PMU初级二星 财产: 经验: 魅力: 来自: 上海市 鉴定: 本功能已经被关闭 发帖: 128篇 注册: 2002-5-26 -------------------------------------------------------------------------------- 将项目的生命周期分为四个基本阶段:概念、开发、实施、结束,前两个称为项目可行性阶段,后两个称为项目获取阶段。(参见“IT项目管理” P38) -------------------------------------------------------------------------------- 有什么样的想法,就有什么样的未来 PMP -------------------------------------------------------------------------------- [ 本文发表于 2002年9月6日 15:44:48 ] DGHFX 军衔: PMU初级一星 财产: 经验: 魅力: 来自: 不告诉你 :) 鉴定: 本功能已经被关闭 发帖: 66篇 注册: 2001-12-8 -------------------------------------------------------------------------------- bcab -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- [ 本文发表于 2002年9月8日 10:02:37 ] zhuangqianzhi 军衔: PMU初级一星 财产: 经验: 魅力: 来自: 不告诉你 :) 鉴定: 本功能已经被关闭 发帖: 58篇 注册: 2002-6-30 -------------------------------------------------------------------------------- I think b c b b is right. -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- [ 本文发表于 2002年9月8日 15:37:10 ] bomber 军衔: PMU初级二星 财产: 经验: 魅力: 来自: 上海市 鉴定: 本功能已经被关闭 发帖: 128篇 注册: 2002-5-26 -------------------------------------------------------------------------------- 1.a 2.d (multiple projects,large orgnizations ) 3.b ( PMBOK 2.4.1 P24 ) -------------------------------------------------------------------------------- 有什么样的想法,就有什么样的未来 PMP -------------------------------------------------------------------------------- [ 本文发表于 2002年9月9日 22:42:50 ] CG 军衔: PMU初级三星 财产: 经验: 魅力: 来自: 不告诉你 :) 鉴定: 本功能已经被关闭 发帖: 263篇 注册: 2002-2-5 -------------------------------------------------------------------------------- 1, b. see PMBOK 2, d. 3, b. 4, -
|